Traffic management systems for Baku Metro, Azerbaijan
In 2007-2013, LOT Group has implemented Traffic management system (TMS) in the Baku Metro. The Central traffic control center was created, and required equipment was installed to establish communication between the Central traffic control center and 10 station control centers. SCADA handles 20 – 30 thousand of digital signals.
The Central traffic control center is situated on 28th of May station and is equipped with:
- Server QNX
- Database backup server
- Data base management system server
- Automated workplace (AWP) of central dispatcher
- Communication network equipment
- Video wall of operator’s AWP
- Displays of trains dispatchers for Metro’s red and green lines
- Video server
- Graphics processor
- Video wall of information display system (1 х 12 m)
- Video wall of executive controller’s AWP
- Executive controller AWP
The equipment of automation and telemechanics of train movement to communicate with newly established Central traffic control center contains:
- Monitoring and signaling units (24 sets)
- Server hardware equipment
- Network switch type Catalyst 3560 24 10/100/1000T
- AWP of centralization room operator (main and backup), intended to control the devices of route-relay station centralization
- Automated workplace of electromechanician to control signaling systems parameters
- Communication devices power supply system.
Modernization of the local and central traffic control systems was performed without the train movement stoppage.
Out-of-date systems and control panels of the dispatchers were substituted by new ones at all the stations.
Traffic control at the stations and at the Central traffic control center is performed by means of the modern micro-processing technologies (systems of distributive controllers, servers, data transmission through optic communication lines).
Control is carried out from AWPs.
Unique software allows to control the train operation, define the faults of the field devices, archive all the events connected with the train operation.
Traffic management systems for Kharkov Metro, Ukraine
In terms of implementation of the Traffic management system (TMS) in Kharkov Metro since 2010 LOT Group of companies has equipped the trains with the automatic speed control devices. For now more than 15 trains are equipped with automatic speed control devices. These devices are intended for providing safety train operation. They perform the following functions:
- Control of the current train speed and check of its correspondence to the authorized speed at this section.
- Control of the conditions of all the train systems.
- Driver’s actions control.
If automatic speed control system defines the discrepancy of some parameters it transfers the train operation into safe mode. In some cases complete stop is possible. Simultaneously relevant signal is transmitted to the train control center of the metropolitan.
Implementation of the automatic speed control system allows to increase safety of train operation, prevent faults in train operation and emergency situations.
Automatic Train Control System in Baku Metro, Azerbaijan
In 2008 — 2013 relay processing based interlocking system was implemented at 5 stations of Baku Metro. The implemented system improved safety and reliability at Icheri Sheher, Azadlig Prospekti, Darnagul, 28 May stations by using hi-tech equipment.
The following equipment was installed at each station:
- remote control cabinets (RC)
- remote signaling cabinets (RS);
- interlocking operator’s AWPs;
- technician’s AWPs.
Modernization of the equipment at 28 May station was carried out in two stages. During the first stage (2010) substitution of the display system included assembling of cabinets with distributed controllers of remote signaling and equipping of the modern interlocking operator’s AWP as well as equipping of the interlocking technician’s AWP. During the second stage (2013) full modernization of the control system at the station as well as integration of the information subsystem into the complex relay processing based system were performed.
Central Operation Control Center in Baku Metro, Azerbaijan
In 2013 Central Operation Control Center was created in Baku Metro. LOT Group delivered and installed all necessary equipment for the connection with OCC.
The following set of equipment was provided:
- interlocking operator’s server cabinet
- video servers cabinet
- train operators’ AWPs
- information display system structural element, display wall size: 1×12m.
Modernization and integration of the operating train automation and remote control equipment with new OCC was carried out at 14 stations of Baku Metro. All the works at Memar Ajami, 20 Yanvar, Inshaatchilar, Elmlar Akademiyasi, Nizami, Jafar Jabbarly, Khatai, 28 May, Ganjlik, Nariman Narimanov, Ulduz, Gara Garayev, Neftchilar, Аhmedli, Hazi Aslanov stations were performed fully ahead of schedule.
Supervisory Control and Data Acquisition. Selected Project
SCADA Systems for Power Supply in Kiev subway, Ukraine
2004-2012 Complex solution. Supply of equipment packages for 9 traction substations for stations: “Syrets”, “Borispolskaya”, “Chervonyi Khutor”, “Vyrlitsa”, “Demeyevskaya”, “Goloseyevskaya”, “Vasilkovskaya”, “Vystavochny Tsentr”, “Ippodrom“. Installation of supervision, commissioning and startup for traction substations.
- 113 units of Switchgear RU-825 and RU-825OSH;
- 53 units of Rectifier V-TPED;
- 42 units of RESIBLOC Transformer;
- 5 units of AC Metal-Clad Switchgear 380 V;
- 5 units of AC Metal-Clad Switchgear 220 V;
- 6 units of Board of Train Movement Telemechanics Automation ATDP;
- 5 units of DC Board SHPT-220;
- 81 units of Linear Disconnector Cabinet RU-825LR (SHPP-R);
- 4 units of Feed Point of Contact Rail RU-825PR (PPKR);
- 2 units of Switching Station Cabinet RU-825SR (SHPS);
- 8 units of Panel Meters;
- 3 units of Distribution Station PRV, PRZ (RU-825RS);
- 25 units of Commutation Station Cabinet SHPP (RU-825 PP)
- 34 units of Cables Connection Cabinet SHPPK (RU-825PK);
- 3 units of Charging and Rectifying Device VTEU;
- 30 units of Well Pump Automated Control System SAU-SN;
- 9 units of Blowers Automatic Control Cabinet SHSAUV;
- 9 units of Contactor Cabinet SHK, Relay Cabinet;
- 10 units of Substation Alarm Board, Potential Diagram Reading Board;
- 5 units of Input Terminal Blocks Cabinet VK.
SCADA Systems for Power Supply in Almaty Subway, Kazakhstan
2008 Complex solution. Supply of nine complete traction substations for stations of the First Almaty Subway Line: “Raiymbek batyr”, “Zhybek Zholy”, “Almaly”, “Abay”, “Alatau”, “Baiconur”, “Tulpar”, “Electrodepot”. Installation of supervision, commissioning and startup for traction substations.
2012 Complex solution. Supply of complete traction substations for the station ”Sairan” and step-down substation for the station ”Moskva”.
- 213 units of Medium Voltage Switchgears 10 kV;
- 40 units of Medium Voltage Switchgears 10 kV series NEX;
- 75 units of Switchgear RU-825;
- 25 units of Negative Rail Switchgear RU-825OSH;
- 25 units of Rectifier V-TPED;
- 102 units of Transformer;
- 16 sets of AC Metal-Clad Switchgear 380V (191 cabinets);
- 11 sets of AC Metal-Clad Switchgear 220V (132 cabinets);
- 14 sets of ACC Panel;
- 13 sets of DC Board SHPT-220 (50 cabinets);
- 52 units of Linear Disconnector Cabinet RU-825LR;
- 119 units of Cables Connection Cabinet RU-825PK;
- 34 units of Charging and Rectifying Device VTEU;
- 2484 units of Accumulator Battery;
- 2 units of Cabinet with meters;
- 2 sets of telemechanical equipment.
SCADA Systems for Power Supply in Minsk Subway, Belarus
2004-2012 Complex solution. Delivery of equipment for eleven traction substations of stations “Kamennaya gorka”, “Kuntzevshchina”, “Pushkinskaya”, “Uruchye”, “Borisovsky Trakt”, “Vostok”, “Institut Kultury”, “Petrovschina”, “Mikhaylovo”, “Grushevka” and for the Depot. Installation of supervision, commissioning and startup for traction substations.
- 84 units of Switchgear series RU-825;
- 1 unit of Traction network monitoring system;
- 34 units of Switching point cabinet SHPP (RU-825 PP);
- 11 units of Negative busbar disconnector cabinet SHROSH;
- 6 units of Contact Rail Power Supply Cabinet PPKR (RU-825PR);
- 8 units of Blowers Automatic Control System Cabinet SHSAUV;
- 11 units of Temperature Control Unit UZP;
- 4 units of Contactor cabinet SHK (RU-825ZK);
- 29 units of Switchgear RU-825LR.
SCADA Systems for Power Supply in Baku Subway, Azerbaijan
2008 Complex solution. Supply of two complete traction substations for stations “Nasimi” and “Azadlig”. Installation of supervision, commissioning and startup for traction substations.
2011 Complex solution. Supply of step-down substation for stations “Keroglu”. Installation of supervision, commissioning and startup for traction substations.
2012 Complex solution. Supply of step-down substation for the technological building of Baku Subway.
- 40 units of Switchgear 10kV;
- 3 sets of Switchgear 10kV series NEX (27 units);
- 12 units of Converter Section V-TPED;
- 31 units of Transformers;
- 20 units of Switchgear RU-825;
- 10 units of Switchgear RU-825OSH;
- 23 units of Switchgear RU-825LR;
- 27 units of Switchgear RU-825PK;
- 2 units of Switchgear ATDP;
- 2 units of Board of Signaling, Centralization and Blocking SCB;
- 1 set of AC Metal-Clad Switchgear 380V (38 cabinets);
- 3 sets of AC Metal-Clad Switchgear 220V (36 cabinets);
- 2 sets of AC Metal-Clad Switchgear 380/220V (15 cabinets);
- 13 units of Charging and Rectifying Device VTEU;
- 4 units of Capacitor Device UK;
- 4 units of Charging and Rectifying Device UPS;
- 1 unit of Input Terminal Blocks Cabinet SHVK;
- 4 units of Telemechanics System STP and Centralized System of Diagnosis and Visualization of Operator;
- 2 set of Traction Substation Microclimate System with microprocessor control (11 cabinets);
- 5 units of Fan and pressure valve control cabinets;
- 2 units of Cabinet with meters ShS;
- 382 units of Accumulator battery;
- 47 units of Distribution points PR11;
- 3 sets of DC Board SHPT-220 (12 cabinets);
- 1 set of Board SHPT-230 (4 cabinets).
SCADA Systems for Power Supply in Kazan Subway, Russia
2010 Equipment delivery for traction substation of the station “Kozya Sloboda”.
- 6 units of RESIBLOC Transformer;
- 2 units of Metal-Clad Switchgear KRU-0.4/0.23;
- 2 units of Capacitor Device UK.
Supervisory Control and SCADA Systems for Power Supply in Yekaterinburg Subway, Russia
2011 Complex solution. Delivery of equipment package for two traction substations of stations “Chkalovskaya”, “Botanicheskaya”. Installation of supervision, commissioning and startup for traction substations.
- 25 units of Switchgear RU-825 and RU-825OSH;
- 6 units of Rectifier V-TPED (including converter section and RESIBLOC transformer);
- 12 units of RESIBLOC Transformer;
- 2 sets of AC Metal-Clad Switchgear 380V;
- 2 sets of AC Metal-Clad Switchgear 220V;
- 2 sets of Board of Train Movement Telemechanics Automation ATDP;
- 2 sets of DC Board SHPT-230;
- 38 units of Switchgear 10.5 kV ZS1;
- 4 units of Capacitor Device UK;
- 2 units of Cabinet with meters ShS;
- 4 units of Charging and Rectifying Device VTEU;
- 4 units of Charging and Rectifying Device UPS;
- 244 units of Accumulator Battery;
- 3 units of Thyristor circuitor cabinet ShTZ;
- 21 units of Switchgear RU-825LR;
- 23 units of Switchgear RU-825PK;
- 10 units of Current block relay BRT;
- 2 sets of STS operator workstation ARM-D;
- 2 units of Telemechanics cabinet;
- 2 units of Connections cabinet ShP.
SCADA Systems for Power Supply in St. Petersburg Subway, Russia
1998-2001, 2006 Supply of equipment for subway traction substations in St Petersburg (Russia).
- 4 units of Rectifier V-TPED;
- 1 unit of Commutation Station Cabinet SHPP (RU-825 LR).
SCADA Systems for Power Supply in Moscow Subway, Russia
1994-2009 Delivery of equipment sets for Moscow Subway traction substations.
- 18 units of Rectifier series V-TPED;
- 46 cabinets Complete switchgear:
- 17 units of Cables connection;
- 10 units of Line disconnector switchgear RU-825LR;
- 4 cabinets DC board SHPT-220.
SCADA Systems for Power Supply in Kharkiv Subway, Ukraine
2003-2009 Complex solution. Supply of three traction substations. Installation of supervision, commissioning and startup for traction substations.
- 2 sets of Medium Voltage Switchgears 10 kV and 6 kV series NEX;
- 23 units of Switchgear RU-825;
- 12 units of Rectifier V-TPED;
- 8 units of RESIBLOC Transformer;
- 1 unit of Traction Network Monitoring System SMTN;
- 4 sets of AC Metal-Clad Switchgear;
- 2 sets of DC Board SHPT-220;
- 2 units of Board of Train Movement Telemechanics Automation ATRP;
- 40 units of Cables Connection Cabinet RU-825PK (SHPPK);
- 117 units of Accumulator battery;
- 2 units of Capacitor Device UK;
- 1 unit of Remote Control Cabinet;
- 20 units of Feeding point cabinet;
- 14 units of Linear Disconnector Cabinet SHPP-R (RU-825LR);
- 9 units of Commutation Station Cabinet SHPP (RU-825PP);
- 3 units of Negative Rail Disconnector Cabinet SHROSH;
- 25 units of Blowers Automatic Control Cabinet SHSAUV;
- 2 units of Disconnectors Control Cabinet SHUR;
- 22 units of Shutters Control Cabinet SHUZ;
- 2 units of AC Complete Board SHKT;
- 1 unit of Automatic Transfer Switch Cabinet SHAVR;
- 1 unit of Input Terminal Blocks Cabinet SHVK;
- 1 unit of Substation Alarm Board;
- 1 unit of Charging and Rectifying Device VTEU.
Public Address System. Selected Project
Public Address System for Lexus showroom in Kharkiv, Ukraine
Our system of public information announcements was installed it the Lexus car showroom in Kharkiv. The system was customized to Customer requirements and is able to deal with background music, announcements (both live and recorded), emergency alarms.
The system we have installed features the following:
- 200 m of communication network;
- 10 speakers for the main hall and 12 additional loudspeakers for other rooms;
- powerful sound amplifier to optimize sound distribution;
- launching and configuration of the system;
- education of showroom staff.
Public Address System for Mitsubishi showroom in Kharkiv, Ukraine
Our system of public information announcements was also installed it the Mitsubishi car showroom in Kharkiv. The system was customized to Customer requirements and is able to deal with background music, announcements (both live and recorded), emergency alarms.
The system we have installed features the following:
- 150 m of communication network;
- 8 speakers for the main hall and 6 additional loudspeakers for other rooms;
- powerful 800 W sound amplifier to optimize sound distribution;
- launching and configuration of the system;
- education of showroom staff.
Passenger Information System. Selected Project
Passengers Information System in the Subway of Baku, Azerbaijan
Among a wide range of different automated system implemented by LOT Group in the Baku Subway there was a unified precision timing system (launched in 2007).
This system ensures the accuracy of all information and security systems of the subway, coordinates the work of displays at the stations and provides unified precise time for a dispatching subsystem.
LOT Group designed, manufactured and installed the following equipment at 23 stations of the Baku Subway:
- 46 usual clocks (showing time);
- 46 interval clocks (showing time passed after previous train departure);
- 70 clocks for dispatcher needs;
- a central clock server with GPS devices (satellite time correction);
- 26 switching units;
- an optical communication network.
Also the system allows controlling electro-mechanical clock using second and minute’s pulses.
Passengers Information System in the Subway of Kharkiv, Ukraine
LOT Group’s unified precision timing system was also implemented in the Kharkiv subway as a part of Passenger Information System. It was launched in 2006 and modernized in 2010).
The system has been integrated into the existing software environment and synchronized with all the subway systems. The system serves displays at the stations and provides unified precise time for a dispatching subsystem.
LOT Group designed, manufactured and installed the following equipment at 29 stations of the Kharkiv Subway:
- 58 usual clocks (showing time);
- 58 interval clocks (showing time passed after previous train departure);
- 87 clocks for dispatcher needs;
- a central clock server with GPS devices (satellite time correction);
- 34 switching units;
- an optical communication network.
Also the system allows controlling electro-mechanical clock using second and minute’s pulses.